Raritain River Railroad Bridge Piers
Project Photos

Type of STAY-FORM® Application
In order to create a concrete jacket around the ten existing piers, the Project Manager, Gustavo Pradilla, for Trevcon Construction, Inc. chose STAY-FORM® as the most advantageous form compared to alternative forming products (plywood or modular forms). The divers like the fact that the Tremie concrete (11” slump) displaced the water in the form and also the fact that they could visually inspect the concrete pour. The concrete mix design incorporated an anti-washout admixture.

Project
Underwater Repair of Railroad Bridge Piers
Structure No. 39

Location
Raritain River
South Amboy / Perth Amboy, NJ

Owner
NJ Transit
Newardk, NJ

Engineer
HNTB Corp.
Wayne, NJ

General Contractor
Trevcon Construction Co., Inc.
Liberty Corner, NJ

concrete formworks