FDA Cup Expansion (Central Utility Plant Expansion)
Project Photos

Type of STAY-FORM® Application
The contractor used “Steel Dog” (steel-dog.com) wall ties and “Hycrete”(an admixture, www.hycrete.com) in order to waterproof the 30’ high  by 300’ long blindside wall project at the FDA Research facility.  The contractor felt this was more economical than other waterproofing alternatives.

Project
FDA Cup Expansion (Central Utility Plant Expansion)
Federal Research Center at White Oak, MD

Location
Silver Springs, MD 20903

Owner
General Services Administration (GSA)
Property Development Division
7th & D Street SW, Room 2002
Washington, DC 20407

Engineer
Hankins & Anderson
Glen Allen, VA

General Contractor
Balfour Beatty Construction
Silver Springs, MD

Concrete Contractor
Premier Concrete Const., Inc.
Manassas, VA

Steel Ply concrete forming system
Walgreens - BB&T Bank
Project Photos

Type of STAY-FORM® Application
In order to waterproof this blindside wall project the contractor attached a Voltex (cetco.com) Bentonite Geotextile membrane to the stay-form. He then applied Bentoseal around all of the wall ties. Then a Voltex patch was placed over the wall tie and more Bentoseal was applied over the patch.

Project
Walgreens – BB&T Bank

Location
Gatlinburg, TN

Architect
Architectural Services Group
Knoxville, TN

forming concrete

General Contractor
Sequoyah Limited, LLC
Knoxville, TN

Waterproofing Contractor
M & M Waterproofing Co.
Denver, NC

Steel Ply concrete forming system
VA Medical Center
Project Photos

Type Of Stay Application
Approximately 12,000 SF. of stay was used in forming a three story seismic shear wall. The owner liked the fact that the use of STAY-FORM® allowed the contractor to construct this blindside wall without interrupting the interior operations of the hospital.

Location
Memphis, TN

Architect
Walker Jones & Francis Mah, Inc.
Memphis , TN

Engineer
Allen & Hoshall, Inc.
Memphis, TN

Seismic Consultants
Rutherford & Chekene, Inc.
San Francisco, CA

General Contractor
Caddell Construction Co., Inc.
Memphis, TN

Steel Ply concrete forming system
Front Street Parking Garage B
Project Photos

Location
At Adriaen’s Landing
Hartford, CT.

Architect
The Slam Collaborative
Glastonbury, CT

Engineer
Girard & Co.
Rock Hell, CT

Construction Manager
Perini Building Company
Hartford, CT

General Contractor
Fusco Corporation
New Haven, CT

Concrete Contractor
Waterbury Masonry & Foundation
Cheshire, CT

build concrete wall forms
Alamance Medical Regional Center
Project Photos

Type of STAY-FORM® Application
Dwayne Goldberg used STAY-FORM® for the first time in a blindside wall application on this hospital expansion project. The Symons STAY-FORM® hook-ties were spaced 24” on center horizontally and 12″ on center vertically for the 16′ high 12″ & 14″ thick walls. Voltex waterproofing was applied to the STAY-FORM® . The 3000psi concrete was placed in approximately 4 foot lifts.

Location
Burlington, NC

Architect
Peterson Associates
Charlotte, NC

Engineer
King Guinn Associates, Structural Engineers
Charlotte, NC

General Contractor
Bovis
Burlington, NC

General Contractor
DSG Foundation Contractors
Charlotte, NC

WAWA Convenience Store
Project Photos

Location
Collegeville, PA

Contractor
Neuber Construction

STAY-FORM® Distributor
Gatti – Morrison

Oakdale Elementary School
Project Photos

Location
Oakdale Elementary School
Charlotte, NC

Architect
Shuller, Ferris, Lindstrom & Associates
Charlotte, NC

Engineer
Mulkey Engineers & Consultants
Charlotte, NC

General Contractor
LeChase Construction Services, LLC
Huntersville, NC

Concrete Contractor
Southern Concrete Services
Rock Hill, NC