Foundation Piles – Concrete Grade Beam Forms

New Jersey DOT Maintenance Facility
Project Photos

Type of STAY-FORM® Application
Jim Mallett was the carpenter foreman for the Dinallo Construction Corp. And this was his first time using STAY-FORM® to form pile caps. He repeatedly commented on how fast and easy it was to work with STAY-FORM® when compared to the traditional methods of using plywood or modular forms as he had for over twenty years.

NJ DOT Maintenance Facility
Location: Newark, NJ

Engineer
Consulting Engineers Collaborative, Inc.
Kenilworth, NJ

 

Concrete forms for sale

General Contractor
Terminal Construction Corp.
Dinallo Construction Corp.
Wood-Ridge, NJ

foundation piles pier and beams foundation concrete grade beam forms
New Mecklenberg County Courthouse
Project Photos

Mecklenberg County Courthouse
Location:
Charlotte, NC

Architect
Schenkel Schultz Architects – http://www.schenkelshultz.com/
Charlotte, NC

Engineer
HDR
Alexandria, VA

General Contractor
Meyers & Chapman
Charlotte, NC

Concrete Contractor
Doggett Concrete
Charlotte, NC

STAY-FORM® Dealer
Tucker – Kirby Co
Charlotte, NC

foundation piles pier and beams foundation concrete grade beam forms
Lonnie Hamilton III Public Services Building
Project Photos

Lonnie Hamilton III Public Services Building
Charleston, SC
GC: J.A. Jones of the Carolinas
Pile Caps and Grade Beams

foundation piles pier and beams foundation concrete grade beam forms
East Bay Townhouses
Project Photos

Type of STAY-FORM® Application
This was the first time project Superintendent, Jerry Wall, used STAY-FORM® to form grade beams and pile caps. After making three pours (approximately 600 cubic yards) for the foundation, he mentioned the fact that stay-form was definitely faster than using modular type forms.

East Bay Townhouses
Location:
102 East Bay Townhouses
Charleston, SC

Architect
Molten-Lamar Architects
Columbia, SC

Engineer
Kyzer & Timmerman
Columbia, SC

General Contractor
NBM Construction Company, Inc.
Charleston, SC

Quality Inn & Suites
Project Photos

Type of STAY-FORM® Application
This was the first project that Arvis Shepard used STAY-FORM® on. His laborers installed approximately 12,000sf of stay-form for the pile caps and grade beams.

Location
Quality Inn & Suites
Patriots Point Blvd.
Mount Pleasant, SC

Architect
Bell Architects
Mount Pleasant, SC

Engineer
Bobby Curry Engineers, Inc. – http://www.curryengineering.com/
Mount Pleasant, SC

General Contractor
Vernon Tarlton Construction, Inc.
Hickory, NC

Coastal Carolina University Football Stadium
Project Photos

Type of STAY-FORM® Application
This was the first time Steve Griffin used STAY-FORM® to form pile caps(pc-2, pc-3, pc-4). He felt that the lightweight (11.9 lbs. Each) STAY-FORM® sheets were easy to handle and assemble into the different pile cap shapes when compared to using modular forms or 3/ 4″ plywood. Time and labor savings in not having to strip the forms is significant.

Coastal Carolina University Football Stadium
Location:
Coastal Carolina University
Conway, SC

Architect
McMillan, Smith & Partners , PLLC
Spartanburg, SC

Engineer
Davis & Floyd, Inc.
Charleston, SC

General Contractor
Hill Construction
Mt. Pleasant, SC

Four Seasons Hotel and Tower
Project Photos

A 50′ x 50′ x 15′ pile cap was typical for the 150′ deep caissons on this 65 story hotel/condo project.

Architect
Bermello Ajamil & Partners
Miami, FL

Engineer
Desimone Consulting Engineers, PLLC
Coral Gables, FL

Concrete Contractor
Capform
Tampa, FL

Mfg. Rep.
Bill Owens
Madeira Beach, FL

Super Fresh Grocery Market
Project Photos

Type Of Stay Application
This project had approximately 700 linear feet of grade beams with integral pile caps that that were 32” high and 22” wide as well as thirty individual pile caps. The job site is located at the river edge on reclaimed land.

Super Fresh Grocery Market
Location:
Philadelphia , PA

Concrete Contractor
US Concrete
Vineland, NJ

STAY-FORM® Dealer
Gatti – Morrison – http://www.gattimorrison.com/
Norristown, PA

Market Street Parking Garage
Project Photos

Market Street Parking Garage
Location:
Market St. & 2nd St.
Wilmington, NC

Architect
HR Associates
Raleigh, NC

Engineer
Lasater, Hopkins, Chang PC
Raleigh, NC

General Contractor
White Construction Company
Wilmington, NC

Concrete Contractor
Beachcrete, Inc.
Wilmington, NC

Hill Residence
Project Photos

Type of STAY-FORM® Application
Grade Beams/Pile Caps

Hill Residence
Location:
5719 N. Ocean Blvd.
Myrtle Beach, SC

Architect
Ayres & Associates
Murrells Inlet, SC

General Contractor
Poulin Brothers Homes, Inc.

Concrete Contractor
Ben’s Concrete
Pawley’s Island, SC

STAY-FORM® Dealer
Guaranteed Supply Company – http://www.guaranteedsupply.com/
Myrtle Beach, SC

Briarcliff Manor Residence
Project Photos

Type of STAY-FORM® Application
Grade Beams and Pile Caps were formed using STAY-FORM®. Due to the high water table, the pile caps were wrapped in a filter fabric in order to stop any sand from flowing into the pile caps.

Briarcliff Manor Residence, Myrtle Beach, SC
Location:
Myrtle Beach, SC

Architect
SGA Architecture
Pawley Island, SC

General Contractor
Poulin Brothers Homes, Inc.

Concrete Contractor
Ben’s Concrete
Pawley Island, SC